Please download free flash plug in
 
 
 
     
 

 

 

PRODUCTION PLANT  DISPOSITION

The active “lay-out” envisions an optimal and rational placement of the production line and auxiliary plant rooms, taking into consideration the material process protocol, including the storage, input of the raw material and forwarding of the final product.

Special attention is attended towards the design of the plant, in the aim of minimizing the production period while maximising prodution output through a compact equipment design of the and its rational lay-out.
 
 
The high quality of the final product, with the strict dimension tolerances and the quality of the material itself is the constant goal of the INTERMETAL AL production plant. These goals are achievable through:
 
            Highly automatized mid-frequency induction aggregate furnace for the melting of AL
            Simplified casting system with minimal timing
            Plant space, storage and auxiliary rooms
            The quality control and guidance
            Fast traced manipulation of the transport.
 
 
 

MELTING PROCESS

The melting process is accomplished by the previously established receipt created by the head technician, who, by taking an analysis of a 50% mid-trial melted AL scrap in the furnace and having done the chemical analysis in the laboratory, creates corrections (by adding certain raw

materials , salts or chemical additives) in order to reach the desired quality. Additionally, and periodically during the production process the temperature of the melted AL is taken from the furnace, in order not to exceed a certain and required temp. limit.
 
 
At the end of the melting process, a sample from the final output is taken and processed in the laboratory by using the ADP system (Automatic Detail Process), through which an official quality declaration is issued on the type, quality, static detail process, the issue of a quality certificate and invoice.